SSANGYONG Y200
MANUAL TRANSMISSION 5B-45
INSPECTION OF COMPONENTS
Inspection Procedure
1. Clean all parts with solvent and dry them with
compressed air. Check the following parts for
cracks and damaged sealing surfaces.
•
Case
•
Extension housing
•
Shift Cover
•
Input bearing retainer
•
Counter shaft rear bearing retainer
2. Check the parts which support bearings and shafts
YAD5B1B0
for excessive wear and replace them if necessary.
3. Check the bearing surfaces of the following parts ;
•
Input shaft
•
Main shaft and its gears
•
Counter shaft and 5th drive gear
4. Check the reverse idler shaft and its gears.
YAD5B1C0
Notice: Replace excessive wear parts and do not
file on the hardened surface and precision ground.
YAD5B1D0