Master Cylinder - SSANGYONG Y200 Manual

Hide thumbs Also See for Y200:
Table of Contents

Advertisement

5C-12 CLUTCH
9. Installation should follow the removal procedure
in the reverse order.
Notice:
Before installation, clean oil and grease on the
flywheel surface.
Do not clean the clutch disc and release bearing
in solvent.
YAD5C140
10. Tighten the pipe nut and the cylinder mounting
bolt as the specified torque.
Cylinder mounting bolt
Adapter Nut
YAD5C150

MASTER CYLINDER

Removal & Installation Procedure
1. Draw out the fluid.
2. Pull out the snap pin and clevis pin from the clutch
pedal connection.
3. Remove the clutch tube.
Installation Notice
Tightening Torque
Notice: Be careful not the fluid contact a painted
YAD5C160
surface.
4. Remove the master cylinder mounting nuts and
pull off the master cylinder.
Installation Notice
Tightening Torque
5. Check the clutch pedal operation.
6. Bleed the clutch system.
7. Installation should follow the removal procedure
in the reverse order.
YAD5C170
Hose Nut
A: 1.5 ~ 1.8 kgf.m
Pipe Nut
B: 1.5 ~ 1.8 kgf.m
C: 1.5 ~ 1.8 kgf.m
D: 1.5 ~ 1.8 kgf.m
15 - 18 N•m
(11 - 13 lb-ft)
15 - 18 N•m
(11 - 13 lb-ft)
SSANGYONG Y200

Advertisement

Table of Contents
loading

Table of Contents