5B-16 MANUAL TRANSMISSION
9. Remove the pin from the U-joint assembly using
the punch.
10. Remove the U-joint assembly from the cover
assembly.
YAD5B190
11. Remove the shift rail from the cover assembly
using the punch.
12. Pull out the shift rail from the cover assembly.
13. Inspect and clean all of the disassembled parts
and replace as needed.
YAD5B200
Installation Procedure
1. Insert the shift rail to the cover.
YAD5B210
2. Pull the shift rail to the offset lever using the punch
and assemble them.
YAD5B220
SSANGYONG Y200