SSANGYONG Y200 Manual page 1968

Hide thumbs Also See for Y200:
Table of Contents

Advertisement

4. Remove the chain tensioner.
Preceding work: removal of EGR pipe and oil dipstick tube
5. Hold the camshafts and remove the intake camshaft
sprocket and exhaust camshaft sprocket.
6. Pull out the lock pins with a sliding hammer and remove
the upper guide rail.
Notice
Correctly align the electronic control module onto
the shift plate by using two central pins when
installing.
7. Remove the oil cooler, then remove the intake manifold.
• The intake manifold can be interfered by the cylinder
head bolt (M8 x 50).
ENGINE HOUSING
DI ENG SM - 2004.4
DI02-7
Y220_02012
Y220_02013
Y220_02014
Y220_02015
CHANGED BY
EFFECTIVE DATE
AFFECTED VIN

Advertisement

Table of Contents
loading

Table of Contents

Save PDF