MA lighting dot2 User Manual page 210

Control console
Hide thumbs Also See for dot2:
Table of Contents

Advertisement

d o t 2 U s e r Ma n u a l
Figure 1: Choose clone method window
There are four options available.
Cancel:
Tap to cancel the clone command.
Low Prio Merge:
Tap to add the values from the source fixture to the destination fixture.
If the destination fixture has previous defined values, they will stay.
If the destination fixture has no previous defined values, the fixture will get the values from the source fixture.
Merge:
Tap to add values from the source fixture on the top of the destination fixture.
Overwrite:
Tap to overwrite the existing values from the destination fixture with the values from the source fixture.
Previous defined values will be deleted.
Example Low Prio Merge
Fixture 1 stored on executor 2 - cue 1, has a defined color red and a gobo.
Fixture 2 stored on executor 3 - cue 1, has a defined position pan and tilt.
Figure 2: Fixture 1 and 2 before clone
Let´s assume, you will clone fixture 1 at 2 and you will keep the defined position of fixture 2.
210
© 2016 MA Lighting Technology Gm bH | Dachdeck erstr. 16 | D-97297 W aldbüttelbrunn | Germ any
Phone +49 5251 688865-27 | support (at) m a-dot2.com | www.m alighting.com

Advertisement

Table of Contents
loading

Table of Contents