Configure The Pgu, Pmu, And Rpm Using Tests; Pmu Pulse Timing Preview - Keithley 4200A-SCS Reference Manual

Parameter
Hide thumbs Also See for 4200A-SCS:
Table of Contents

Advertisement

Section 5: Pulse measure and pulse generator units

Configure the PGU, PMU, and RPM using tests

To configure and control the PGU, a user test module (UTM) is needed. You can also use UTMs to
configure and control the PMU and RPM preamplifier. For UTM programming, see
PGUs and PMUs
You can use interactive test modules (ITMs) to configure and control a PMU and RPM preamplifier.
Refer to
Configure a test
An ITM automatically controls the RPM based on the type of test (pulse, CV, SMU). RPM switching
can only be controlled using the
the RPM as a switch
For automatic switching of the RPM in ITMs, the RPM must already have all instrument cabling
connected and recognized by the system. Information on performing this update is in
RPM configuration

PMU pulse timing preview

Before executing a test, you can preview a waveform generated using the settings. This can help you
understand the behaviors of the various test settings without applying signals to the test device. The
Pulse Timing Preview is in the PMU Advanced Test Settings dialog box. An example is shown in the
next figure.
5-20
(on page 13-91).
(on page 6-13) for information on configuring an ITM for the PMU.
rpm_config
(on page 5-8) for details.
(on page 7-10).
Figure 159: Pulse Timing Preview example
Model 4200A-SCS Parameter Analyzer Reference Manual
(on page 13-124) LPT function in a UTM. Refer to
4200A-901-01 Rev. C / February 2017
LPT functions for
Using
Update the

Advertisement

Table of Contents
loading

Table of Contents