ZH
INSTALLATION
INSTALLATION
1. Install the MAP sensor.
2. Install the bolt (1).
3. Connect the Manifold Absolute Pressure (MAP)
harness connector.
4. Install the engine cover. Align the engine cover
retaining clips to the rubber mounts, and push
down firmly to connect engine cover to rubber
mounts.
Note: To ease the installation of the engine cover,
apply a small amount of lubricant to the engine
cover rubber mounts.
5. Connect the negative battery cable.
INSTALLATION - SRT
1. Install the MAP sensor (1).
2. Install the MAP sensor mounting bolts. Tighten to
4.5 N·m (40 in. lbs.).
3. Connect the MAP sensor (1) harness connector.
4. Install the supercharger outlet housing (2). Tighten
the supercharger outlet housing hose clamps.
FUEL INJECTION 14 - 51