iManager NetEco 6000
Device Installation and Commissioning Guide
Dial
Switch
7
8
Step 3 Connect the other end of the network cable to the COM port on the ECC collector.
----End
4.3.7 Connecting the UPS Monitoring Cable
4.3.7.1 Connecting the UPS2000-G Monitoring Cable (MODBUS)
Prerequisites
A network cable used for monitoring is prepared.
Procedure
Step 1 Connect one end of the network cable to the COM_1 or COM_2 port on the Modbus
expansion card of the UPS2000-G.
Issue 03 (2019-03-10)
Default Value
Operations
OFF
ON
Remaining in ON
Copyright © Huawei Technologies Co., Ltd.
4 Connecting Monitoring Cables to Devices
Not in teamwork mode: Remaining in OFF
In teamwork mode: Set toggle switch 7 on the main
control boards of the first and last smart cooling
products to ON, and toggle switch 7 on the main
control boards of the other smart cooling products to
OFF.