Step 6 Set AI/DI_1 Power Supply to On.
Step 7 Click Submit.
----End

6.4.2.1.4 Creating an Icon for a Door Status Sensor on the NetEco

This section describes how to create and configure an icon for a door status sensor in an
equipment room or container.
Prerequisites
You have logged in to the NetEco client by web browser
You have the operation rights for configuring Data Center View.
Procedure
Step 1 Choose Monitor > Topo > Data Center View from the main menu. The Data Center View
window is displayed.
Step 2 In the 3D view editing window, click
Step 3 Drag
displayed, as shown in
Issue 03 (2019-03-10)
to the required position in the view. The Property Panel dialog box is
Figure
You can drag
Copyright © Huawei Technologies Co., Ltd.
.The Toolbox dialog box is displayed.
6-59.
in the toolbox to create an icon for a door status sensor.