Figure 6-66 Querying the ECC500 V6 version number
Modifying Alarm Names for Dry Contacts on the NetEco (for V1.1)
1.
2.
3.
Issue 03 (2019-03-10)
For details about how to modify the alarm names for ECC500 V3 dry contacts, see Modifying Alarm
Names for Dry Contacts on the NetEco (for V1.1).
Choose Configuration > Configuration Management > Data Center Planning from
the main menu. The Data Center Planning window is displayed.
In the navigation tree on the left, select a collector in the rack to switch to the rack design
page.
In the parameters setting area of the collector, expand the corresponding Extended Info
tab, as shown in the following figure. The mapping relationship between the Extended
Info tab name and the collector port is displayed on the NetEco as follows:
If the dry contact is connected through an independent deployment AI/DI unit, see
Table 6-25
and
Table 6-26
If the dry contact is connected through an AI/DI expansion card, see
the mapping.
Copyright © Huawei Technologies Co., Ltd.
for the mapping.
6 Adding Devices
Table 6-27
for
204