Imanager Neteco - Huawei iManager NetEco 6000 Device Installation And Commissioning Manual

Hide thumbs Also See for iManager NetEco 6000:
Table of Contents

Advertisement

iManager NetEco 6000

Device Installation and Commissioning Guide
Item
LAN switch
availability
Issue 03 (2019-03-10)
Maintenan
Method
ce Interval
Semi-annua
Check the
lly
power
indicator
(marked
PWR) of
the switch.
Check the
running
indicator
(marked
SYS) of the
switch.
Copyright © Huawei Technologies Co., Ltd.
Expected
Exception Handling
Result
The PWR
Take corrective measures
indicator is
based on the PWR indicator
steady
status:
green.
Off: The power supply unit
The SYS
(PSU) is not detected, or
indicator is
the board power supply is
blinking
abnormal when the switch
green.
is configured with one
PSU.
Steady red, The possible
causes are as follows:
Two PSUs configured on
the switch are detected, but
the circuit breaker is off.
The power supply is
disconnected.
Both the board and power
over Ethernet (PoE) power
supplies are faulty.
Steady orange: When the
switch is configured with
one PSU, the PoE power
supply is abnormal. When
the switch is configured
with two PSUs, the board
or PoE power supply is
abnormal.
Take corrective measures
based on the SYS indicator
status:
Off: The switch is not
running.
Steady green: The switch is
not running properly or is
starting.
Steady orange: The
indicator takes a self-test
during startup.
Steady red: The switch
does not run properly after
being registered, or alarms
indicating that the power
supply, fan, or temperature
is abnormal are generated.
7 Device Maintenance
256

Advertisement

Table of Contents
loading

Table of Contents