Huawei iManager NetEco 6000 Device Installation And Commissioning Manual page 71

Hide thumbs Also See for iManager NetEco 6000:
Table of Contents

Advertisement

iManager NetEco 6000
Device Installation and Commissioning Guide
Table 4-1 RH2288H V3 port description
No.
1
2
3
4
5
6
7
8
Ports on the RH5885 V3 rear panel
Figure 4-2 Ports on the RH5885 V3 rear panel
Table 4-2 RH5885 V3 port description
No.
Issue 03 (2019-03-10)
Interface
Type
eth0 GE
interface
eth1 GE
interface
eth2 GE
interface
eth3 GE
interface
USB interface
iBMC
management
interface
VGA interface
Server serial
interface
Interface
Type
Copyright © Huawei Technologies Co., Ltd.
4 Connecting Monitoring Cables to Devices
Description
Used for connecting to the LAN switch. eth0 and eth1
comprise a bond, which is used for providing external
services.
If southbound and northbound network isolation is
not adopted, only eth0 or eth1 is required.
If southbound and northbound network isolation is
adopted, both eth0 (or eth1) and eth2 (eth3) are
required.
eth0 (or eth1) is used for providing southbound
services while eth2 (or eth3) is used for providing
northbound services.
Used for connecting to the USB service or the KVM.
Used for connecting to the PC computer to manage
the RH2288H V3 server.
Used for connecting to the monitor or KVM.
Used for connecting to the SMS modem or
commissioning.
Description
60