Creating An Ecc800 Collector On The Neteco - Huawei iManager NetEco 6000 Device Installation And Commissioning Manual

Hide thumbs Also See for iManager NetEco 6000:
Table of Contents

Advertisement

iManager NetEco 6000
Device Installation and Commissioning Guide
Path
System
Settings >
NMS
Application >
NetEco >
Communicati
on
Parameters
Step 4 Set site configuration parameters on the ECC800 WebUI.
Table 6-47 Site Configuration parameters
Path
System
Settings >
System
Parameters >
Site
Configuration
----End

6.5.2.2 Creating an ECC800 Collector on the NetEco

Prerequisites
Procedure
Step 1 Choose Configuration > Configuration Management > Data Center Planning from the
main menu. The Data Center Planning window is displayed.
Step 2 Click
Device Information page.
Issue 03 (2019-03-10)
Parameter
Server IP
Port number
Link to the
monitoring IP
address
Parameter
Smart module
name
System Type
You have logged in to the NetEco client by web browser
You have created a modular or container in Data Center Planning. For detailed
operations, see Creating a Domain.
The IP address of the NetEco connected has been configured on the ECC800 WebUI.
in the upper left area of the Data Center Planning page to switch to the Uncreated
Copyright © Huawei Technologies Co., Ltd.
Default
Setting Value
Value
192.168.0.1
IP address of the primary NetEco server
1
NOTE
The NetEco IP address and the ECC800 IP
address must be configured in the same
network to ensure normal connection
between the NetEco and the ECC800.
31220
31220
WAN_1
WAN_1
Default
Setting Value
Value
FusionMod
Sets the user-defined smart module
ule
name.
FusionMod
Set the required system type.
ule2000
6 Adding Devices
243

Advertisement

Table of Contents
loading

Table of Contents