iManager NetEco 6000
Device Installation and Commissioning Guide
Figure 3-12 Installing a hydrogen detection system (unit: mm)
Step 2 Install components and connect cables as shown in
Pay attention to the negative and positive polarities of the power supply. If the polarities are
connected incorrectly, the device may be burned.
Figure 3-13 Connecting cable 1
Issue 03 (2019-03-10)
Copyright © Huawei Technologies Co., Ltd.
Figure 3-13
and
Figure
3 Installing Devices
3-14.
23