Huawei iManager NetEco 6000 Device Installation And Commissioning Manual page 121

Hide thumbs Also See for iManager NetEco 6000:
Table of Contents

Advertisement

iManager NetEco 6000
Device Installation and Commissioning Guide
The main control board can be Arm7 or M4. The appearance varies with the model
delivered.
The Arm7 main control board has S1 and S2 DIP switches, and the M4 main control board
has only the S2 DIP switch. The S1 DIP switch needs to be set for the Arm7 main control
board and does not need to be set for the M4 main control board.
The Arm7 main control board uses the software of V100R001, and the M4 main control
board uses the software of V100R002.
You need to set only the seventh toggle switch based on teamwork requirements and leave
other toggle switches in their default status.
Figure 4-53 NetCol8000 main control board
(1) Teamwork communication 1
(3) S1 DIP switch of the main control board
Table 4-23 Operations of the DIP switch
Dial
Switch
1
2
3
4
5
6
Issue 03 (2019-03-10)
Default Value
Operations
OFF
Remaining in OFF
OFF
Remaining in OFF
ON
Remaining in ON
ON
Remaining in ON
OFF
Remaining in OFF
ON
Remaining in ON
Copyright © Huawei Technologies Co., Ltd.
4 Connecting Monitoring Cables to Devices
(2) Teamwork communication 2
(4) S2 DIP switch of the main control board
110

Advertisement

Table of Contents
loading

Table of Contents