iManager NetEco 6000
Device Installation and Commissioning Guide

3.1 Layout in the Network Cabinet

There are multiple types of monitoring components. Make installation plans based on the
configurations.
for your reference.
Figure 3-1 Device layout in the network cabinet
Issue 03 (2019-03-10)
Figure 3-1
Relocate the cable manager in the rear door position as high as the device to be installed.
Use a flat-head screwdriver to insert floating nuts into the device mounting holes in the rack rails of
the network cabinet. Ensure that the floating nuts on both sides are on the same horizontal line.
Before connecting power cables for the device, use the ground cable delivered with the device to
connect from the device ground point to the cabinet ground point close to the device mounting holes,
as shown in
Figure
3-2. When there is a special grounding requirement and a cabinet ground bar can
be deployed, use the ground cable prepared by the customer to connect from the device ground point
to the cabinet ground bar.
If no ground cable is delivered with the device, the customer needs to prepare the ground cable.
Copyright © Huawei Technologies Co., Ltd.
3
shows the installation positions for some monitoring components

Installing Devices

3 Installing Devices
14