Huawei iManager NetEco 6000 Device Installation And Commissioning Manual page 82

Hide thumbs Also See for iManager NetEco 6000:
Table of Contents

Advertisement

iManager NetEco 6000
Device Installation and Commissioning Guide
Procedure
Step 1 Connect one end of the network cable to the monitoring port on the smart cooling product.
(1) Main control panel
Issue 03 (2019-03-10)
For NetCol5000C-65kW&80kW, open the rear door, and connect one end of the network
cable to the FE port on the main control panel of the smart cooling product.
Figure 4-15 NetCol5000C-65kW&80kW main control panel
Copyright © Huawei Technologies Co., Ltd.
4 Connecting Monitoring Cables to Devices
71

Advertisement

Table of Contents
loading

Table of Contents