Figure 3-16 Drilling holes and installing expansion sleeves
Step 3 Install the infrared sensor base on the wall.
Step 4 Secure the infrared sensor to the base, as shown in
Figure 3-17 Installing an infrared sensor (method 1)
Issue 03 (2019-03-10)
Determine the method for installing the infrared sensor based on the shape of the base selected.