Figure 6-81 Configuring parameters for a UPS2000 MODBUS-RTU
Table 6-41 MODBUS-RTU device parameter description
Parameter
Name
IP address
Port
Device address
Timeout period
Issue 03 (2019-03-10)
Description
Device name
Set the IP address of the data collector to which the device connects.
Set this parameter to the port through which the device connects to
the collector.
To learn ports on the ECC collector, see Setting RS485 Parameters
for the ECC500 V6 Collector.
Set this parameter to the address set on the device.
Timeout duration for connection test (set to 3s by default)