Connecting Monitoring Cables To Devices; Scenarios For Connecting The Server; Server Port Description - Huawei iManager NetEco 6000 Device Installation And Commissioning Manual

Hide thumbs Also See for iManager NetEco 6000:
Table of Contents

Advertisement

iManager NetEco 6000
Device Installation and Commissioning Guide
4

Connecting Monitoring Cables to Devices

Cable connections specified in this document are based on the cable connection sequences
specified in Preparing a Monitoring Cable. Connect cables in required sequences by
referring to Preparing a Monitoring Cable to prevent device connection failures.
Unless otherwise specified, all network cables in this document are crossover cables.

4.1 Scenarios for Connecting the server

4.1.1 Server Port Description

Ports on the RH2288H V3 rear panel
Figure 4-1 Ports on the RH2288H V3 rear panel
Issue 03 (2019-03-10)
The RH2288H V3 server applies to NetEco Lite.
The RH2288H V3, RH5885 V3, and 2288H V5 servers apply to NetEco Pro.
Copyright © Huawei Technologies Co., Ltd.
4 Connecting Monitoring Cables to Devices
59

Advertisement

Table of Contents
loading

Table of Contents