Figure 4-26 Preparing a cord end terminal
Preparing the RS485 Monitoring Cable
Figure 4-27
Figure 4-27 Preparing the RS485 monitoring cable for ECC collector
Preparing a Dry Contact Monitoring Cable
The method of preparing a dry contact monitoring cable is similar to the method of preparing
the RS485 monitoring cable. Prepare cord end terminals on both ends of each required core
wire based on the number of dry contacts.
Issue 03 (2019-03-10)
shows how to prepare a cord end terminal.