3.3 Installing LAN switches

Procedure
Step 1 Determine the mounting holes for the LAN switch based on the network cabinet device layout,
adjust the guide rails or trays, and install floating nuts.
Step 2 Install the mounting ears delivered with the LAN switch and secure the LAN switch to the
rack rail in the front of the cabinet.
Figure 3-6 Installing LAN switches
Step 3 Install power cables between the LAN switch and the PDU2000.
----End
Follow-up Procedure
If a 24-port LAN switch is configured, one power modules or two power modules need to be
installed for the LAN switch onsite. Insert the power modules into the power slots of the
24-port LAN switch, and tighten the captive screws on the power supply panel.
Issue 03 (2019-03-10)
This section describes only the installation method. The actual product appearance prevails.
The positions of power cable ports vary depending on the LAN switch models. Connect the power cable
based on the actual power port of the LAN switch.