Figure 3-4 Installing a server
Step 4 Connect the server power cables to the PDU2000.
Figure 3-5 Connecting server power cables
----End
Issue 03 (2019-03-10)
The server uses dual power supplies. Connect the two power cables to different PDU2000s.