Adding A Smart Cooling Product; Setting Monitoring Parameters For The Smart Cooling Product - Huawei iManager NetEco 6000 Device Installation And Commissioning Manual

Hide thumbs Also See for iManager NetEco 6000:
Table of Contents

Advertisement

iManager NetEco 6000
Device Installation and Commissioning Guide

6.3.3 Adding a Smart Cooling Product

6.3.3.1 Setting Monitoring Parameters for the Smart Cooling Product

The method of setting monitoring parameters for NetCol5000C-65kW&80kW,
NetCol5000-A035/A042/C025/C030 are the same.
Prerequisites
Context
NetCol5000C-65kW&80kW, NetCol5000-A035/A042/C025/C030 smart cooling products
support MODBUS-TCP, MODBUS-RTU, and SNMP protocols. When
NetCol5000C-65kW&80kW,NetCol5000-A042/C025/C030 smart cooling products use
MODBUS-TCP connection, refer to this section for configuration details.
This section uses NetCol5000-A035_V100R002C00 as an example.
Procedure
Step 1 Tap Settings on the NetCol5000-A035_V100R002C00 home screen.
Step 2 Enter the administrator user name and password and tap
Step 3 Choose Comm Settings > Modbus Settings.
Step 4 Set monitoring parameters.
Table 6-10 Parameter description 1
Parameter
Issue 03 (2019-03-10)
You have obtained the IP address, subnet mask, and default gateway information planned
for the NetCol.
The NetCol is powered on.
The preset user name and password for the NetCol5000-A035_V100R002C00 are respectively Admin
and 000001. To ensure the access security, change the password upon first login.
Copyright © Huawei Technologies Co., Ltd.
Setting
6 Adding Devices
on the screen.
157

Advertisement

Table of Contents
loading

Table of Contents