Follow-up Procedure
If the electromagnet does not work properly after power-on, check the following items:
1.
2.
3.
If any of the preceding conditions occur, troubleshoot the magnetic lock as follows:
1.
2.
3.
4.
Issue 03 (2019-03-10)
Figure 7-26 Removing the fixing plate from the magnetic lock
After the base and the fixing plate are secured, route the magnetic lock cables into the
base and secure all the components.
Install a double-door magnetic lock by performing the operations prior to
reverse order.
Check whether the electromagnets provide magnetic force by attaching magnetizable
iron parts to them.
Check whether the magnetic iron plates align with the electromagnets.
Check whether gaps exist between the magnetic iron plates and the electromagnets.
Check the circuit and rectify any circuit fault.
Adjust the magnetic iron plate base and door panels to ensure that the magnetic iron
plates align with the electromagnets. Ensure that the position deviation is no too large.
If gaps exist between the electromagnets and the magnetic iron plates, rectify the fault by
referring to
Figure
7-27.
If the magnetic iron plates are not level with each other, adjust them by using the flap
shown in
Figure
7-28.