iManager NetEco 6000
Device Installation and Commissioning Guide
Procedure
Step 1 Connect one end of the network cable to the fast Ethernet (FE) port on TP483000D.
Step 2 Connect the other end of the network cable to the Ethernet port on the switch.
----End

4.2.8 Connecting a Monitoring Cable to a CIM01C2

Prerequisites
A network cable used for monitoring is prepared.
Procedure
Step 1 Connect one end of the network cable to the PoE port on the CIM.
Step 2 Connect the other end of the network cable to the Ethernet port on the switch.
----End

4.3 Scenarios for Connecting the ECC500 Collector

4.3.1 Preparing a Monitoring Cable

Prerequisites
Preparing a Cord End Terminal
Figure
Issue 03 (2019-03-10)
A twisted pair, cord end terminal, and RJ45 connector are prepared.
The following tools are prepared:
Wire stripper
Crimping tool
RJ11 crimping tool
Electrician's knife
Polyvinyl chloride (PVC) insulation tape
4-26shows how to prepare a cord end terminal.
Copyright © Huawei Technologies Co., Ltd.
4 Connecting Monitoring Cables to Devices