iManager NetEco 6000
Device Installation and Commissioning Guide
Figure 4-51 Main control board of the NetCol8000-C070
(1) The main control board
Figure 4-52 Main control board of the NetCol8000-C150
(1) The main control board
Step 2 Connect one end of a network cable to the teamwork communications port 1 or 2 on the
NetCol8000 main control board.
Issue 03 (2019-03-10)
Copyright © Huawei Technologies Co., Ltd.
4 Connecting Monitoring Cables to Devices
109