Huawei iManager NetEco 6000 Device Installation And Commissioning Manual page 258

Hide thumbs Also See for iManager NetEco 6000:
Table of Contents

Advertisement

iManager NetEco 6000
Device Installation and Commissioning Guide
Figure 6-85 Page for setting management attributes
Step 12 Click
Step 13 Choose Configuration > Transmission Channel Management > Energy Controller
Transparent Channel Settings.
Step 14 Click Modify after selecting the IP address of the ECC800 connected to the NMS.
Issue 03 (2019-03-10)
IP Address indicates the ECC800 login IP address. Port indicates the ECC800 COM2 port (3212).
Device Address indicates the Polymer T/H sensor address.
to save the created device view.
Copyright © Huawei Technologies Co., Ltd.
6 Adding Devices
247

Advertisement

Table of Contents
loading

Table of Contents