Huawei iManager NetEco 6000 Device Installation And Commissioning Manual page 88

Hide thumbs Also See for iManager NetEco 6000:
Table of Contents

Advertisement

iManager NetEco 6000
Device Installation and Commissioning Guide
Figure 4-23 UPS5000-A-60 kVA/80 kVA/120 kVA functional components and control signal
ports
(1) FE port
Figure 4-24 FE port on the UPS monitoring module of the 300 kVA UPS and models with higher
capacities
(1) FE port
Step 2 Connect the other end of the network cable to the Ethernet port on the switch.
Issue 03 (2019-03-10)
Copyright © Huawei Technologies Co., Ltd.
4 Connecting Monitoring Cables to Devices
77

Advertisement

Table of Contents
loading

Table of Contents