Side-By-Side Flush Mounting - ABB Relion 650 Series Technical Manual

Bay control
Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

Section 16
IED hardware
16.4.5
16.4.5.1
16.4.5.2
690

Side-by-side flush mounting

Overview
If IP54 is required it is not allowed to flush mount side by side mounted cases. If
your application demands side-by-side flush mounting, the side-by-side mounting
details kit and the 19" panel rack mounting kit must be used. The mounting kit has
to be ordered separately. The maximum size of the panel cut out is 19".
With side-by-side flush mounting installation, only IP class 20 is
obtained. To reach IP class 54, it is required to mount the IEDs
separately. For cut out dimensions of separately mounted IEDs, see
section
"Flush
Use only the screws included in the mounting kit when mounting
the plates and the angles on the IED. Screws with wrong dimension
may damage the PCBs inside the IED.
Please contact factory for special add on plates for mounting FT
switches on the side (for 1/2 19" case) or bottom of the relay.
Mounting procedure for side-by-side flush mounting
2
1
IEC06000181-2-en.vsd
IEC06000181 V2 EN-US
Figure 318:
Side-by-side flush mounting details (RHGS6 side-by-side with 1/2 x
19" IED).
mounting".
3
4
1MRK 511 424-UEN B
IP10329-1 v1
M11975-3 v3
M12730-6 v4
Bay control REC650 2.2 IEC
Technical manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rec650

Table of Contents