Mounting Procedure For Side-By-Side Flush Mounting - ABB Relion 670 2.0 IEC Series Installation Manual

Protection and control
Table of Contents

Advertisement

1MRK514019-UEN A
5.3.5.2
670 series 2.0 IEC
Installation manual
Use only the screws included in the mounting kit when mounting the
plates and the angles on the IED. Screws with wrong dimension may
damage the PCBs inside the IED.
Please contact factory for special add on plates for mounting FT
switches on the side (for 1/2 19" case) or bottom of the relay.

Mounting procedure for side-by-side flush mounting

2
1
IEC06000181-2-en.vsd
IEC06000181 V2 EN
Figure 9:
Side-by-side flush mounting details (RHGS6 side-by-side with 1/2 x
19" IED).
The required torque for the screws is 3.5 Nm.
PosNo
Description
1
Mounting plate
2, 3
Screw, washer
4
Mounting angle
3
4
Quantity
2
16
2
Section 5
Mounting
Type
-
M4x6
-
31

Advertisement

Table of Contents
loading

Table of Contents