Mounting Methods - ABB Relion SMU615 Product Manual

Substation merging unit
Hide thumbs Also See for Relion SMU615:
Table of Contents

Advertisement

Substation Merging Unit
SMU615
Product version: 1.0
Other functions
Table 38. Pulse timer (PTGAPC)
Characteristic
Operate time accuracy
Table 39. Time delay off (8 pcs) (TOFPAGC)
Characteristic
Operate time accuracy
Table 40. Time delay on (8 pcs) (TONGAPC)
Characteristic
Operate time accuracy

12. Mounting methods

By means of appropriate mounting accessories, the standard
merging unit case can be flush mounted, semi-flush mounted or
wall mounted. The flush mounted and wall mounted merging
unit cases can also be mounted in a tilted position (25°) using
special accessories.
Further, the merging units can be mounted in any standard 19"
instrument cabinet by means of 19" mounting panels available
with cut-outs for one or two merging units. Alternatively, the
merging units can be mounted in 19" instrument cabinets by
means of 4U Combiflex equipment frames.
For routine testing purposes, the merging unit cases can be
equipped with test switches, type RTXP 18, which can be
mounted side by side with the merging unit cases.
GUID-1DF0E512-D40E-47E0-9B29-098C85AAC3F6 V1 EN
Figure 4.
Flush mounting
ABB
Value
±1.0% of the set value or ±20 ms
Value
±1.0% of the set value or ±20 ms
Value
±1.0% of the set value or ±20 ms
Mounting methods
• Flush mounting
• Semi-flush mounting
• Semi-flush mounting in a 25° tilt
• Rack mounting
• Wall mounting
• Mounting to a 19" equipment frame
• Mounting with an RTXP 18 test switch to a 19" rack
Panel cut-out for flush mounting
• Height: 161.5 ±1 mm
• Width: 165.5 ±1 mm
GUID-BA15FDF8-F33A-4A37-B830-2DCDCA4C4AF8 V1 EN
Figure 5.
Semi-flush mounting
1MRS758420 B
GUID-17D20198-FE5C-4454-B762-809610A6B16C V1 EN
Figure 6.
Semi-flush mounting in a 25º tilt