Manuals and User Guides for ABB Relion REQ650. We have
13
ABB Relion REQ650 manuals available for free PDF download: Applications Manual, Commissioning Manual, Manual, Product Manual, Operation Manual
ABB Relion REQ650 Applications Manual (340 pages)
Breaker protection
Brand:
ABB
| Category:
Protection Device
| Size: 3.26 MB
Table of Contents
Table of Contents
7
Section 1 Introduction
21
This Manual
21
Intended Audience
21
Product Documentation
22
Product Documentation Set
22
Document Revision History
23
Related Documents
23
Symbols and Conventions
24
Symbols
24
Document Conventions
25
Section 2 Application
27
REQ650 Application
27
Available Functions
31
Back-Up Protection Functions
31
Control and Monitoring Functions
32
Station Communication
35
Basic IED Functions
37
REQ650 Application Examples
37
Adaptation to Different Applications
37
Line Bay in a Solidly Earthed Network, Connected to Single Busbar Switchyard
38
Line Bay in a High Impedance Earthed Network, Connected to Single Busbar Switchyard
39
Line Bay in a Solidly Earthed Network, Connected to Double Busbar Switchyard
40
Line Bay in a High Impedance Earthed Network, Connected to Double Busbar Switchyard
41
Functionality Table
41
Transformer Bay in a Solidly Earthed Network, Connected to Single Busbar Switchyard
44
Transformer Bay in a Solidly Earthed Network, Connected to Double Busbar Switchyard
45
Transformer Bay in a High Impedance Earthed Network, Connected to Single Busbar Switchyard
46
Functionality Table
46
Section 3 REQ650 Setting Examples
49
Setting Example for a Line Bay with Backup Protection Unit REQ650 A01
49
Calculating Settings for Analogue TRM Inputs 4I 1I 5U
51
Preprocessing Blocks (SMAI)
51
Calculating Settings for Global Base Values for Setting Function GBSVAL
52
Calculating Settings for Instantaneous Phase Overcurrent Protection 3-Phase Output PHPIOC
52
Calculating General Settings
53
Calculating Settings for Four Step Phase Overcurrent Protection 3-Phase Output I> OC4PTOC
53
Calculating Settings for Step 1
53
Calculating Settings for Step 2
55
Calculating Settings for Step 3
57
Calculating Settings for Instantaneous Residual Overcurrent Protection EFPIOC
58
Calculating General Settings
59
Calculating Settings for Four Step Residual Overcurrent Protection 3I0> EF4PTOC
59
Calculating Settings for Step 1
59
Calculating Settings for Step 2
61
Calculating Settings for Step 3
63
Calculating Settings for Breaker Failure Protection 3-Phase Activation and Output CCRBRF
64
Calculating Settings for Pole Discordance Protection CCRPLD
65
Section 4 Analog Inputs
67
Introduction
67
Setting Guidelines
67
Setting of the Phase Reference Channel
67
Relationships between Setting Parameter Base Current, CT Rated Primary Current and Minimum Pickup of a Protection IED
68
Setting of Current Channels
68
Example 1
69
Example 2
70
Examples on How to Connect, Configure and Set CT Inputs for most Commonly Used CT Connections
71
Example on How to Connect a Star Connected Three-Phase CT Set to the IED
72
Example How to Connect Single-Phase CT to the IED
75
Example
77
Examples How to Connect, Configure and Set VT Inputs for most Commonly Used VT Connections
77
Setting of Voltage Channels
77
Examples on How to Connect a Three Phase-To-Earth Connected VT to the IED
78
Example on How to Connect a Phase-To-Phase Connected VT to the IED
80
Section 5 Local Human-Machine Interface
83
Local HMI
83
Display
83
Leds
85
Keypad
85
Local HMI Functionality
86
Protection and Alarm Indication
86
Front Communication
88
Parameter Management
88
Section 6 Current Protection
91
Instantaneous Phase Overcurrent Protection 3-Phase Output PHPIOC
91
Identification
91
Application
91
Setting Guidelines
92
Meshed Network Without Parallel Line
92
Meshed Network with Parallel Line
94
Instantaneous Phase Overcurrent Protection Phase Segregated Output SPTPIOC
96
Identification
96
Application
96
Setting Guidelines
96
Meshed Network Without Parallel Line
97
Meshed Network with Parallel Line
99
Four Step Phase Overcurrent Protection 3-Phase Output OC4PTOC
100
Identification
100
Application
100
Setting Guidelines
101
Settings for Steps 1 to 4
103
2Nd Harmonic Restrain
104
Four Step Phase Overcurrent Protection Phase Segregated Output OC4SPTOC
110
Identification
110
Application
110
Setting Guidelines
111
Settings for Steps 1 to 4
112
2Nd Harmonic Restrain
114
Example
117
Instantaneous Residual Overcurrent Protection EFPIOC
119
Identification
119
Application
119
Setting Guidelines
119
Four Step Residual Overcurrent Protection, Zero, Negative Sequence Direction EF4PTOC
121
Identification
122
Application
122
Setting Guidelines
124
Settings for Steps 1 and 4
124
Common Settings for All Steps
126
2Nd Harmonic Restrain
127
Sensitive Directional Residual Overcurrent and Power Protection SDEPSDE
128
Identification
128
Application
128
Setting Guidelines
129
Thermal Overload Protection, One Time Constant Celsius/Fahrenheit LCPTTR/LFPTTR
137
Identification
137
Application
137
Setting Guidelines
138
Breaker Failure Protection 3-Phase Activation and Output CCRBRF
139
Identification
139
Application
139
Setting Guidelines
140
Breaker Failure Protection Phase Segregated Activation and Output CSPRBRF
142
Identification
142
Application
142
Setting Guidelines
143
Stub Protection STBPTOC
146
Identification
146
Application
146
Setting Guidelines
146
Pole Discordance Protection CCRPLD
147
Identification
147
Application
147
Setting Guidelines
148
Broken Conductor Check BRCPTOC
148
Identification
148
Application
148
Setting Guidelines
149
Directional Over-/Under-Power Protection GOPPDOP/GUPPDUP
149
Application
149
Directional Overpower Protection GOPPDOP
151
Identification
151
Setting Guidelines
151
Directional Underpower Protection GUPPDUP
155
Identification
155
Setting Guidelines
155
Negative Sequence Based Overcurrent Function DNSPTOC
158
Identification
158
Application
158
Setting Guidelines
158
Section 7 Voltage Protection
161
Two Step Undervoltage Protection UV2PTUV
161
Identification
161
Application
161
Setting Guidelines
162
Backup Protection for Power System Faults
162
Disconnected Equipment Detection
162
Equipment Protection, such as for Motors and Generators
162
Power Supply Quality
162
Voltage Instability Mitigation
162
Settings for Two Step Undervoltage Protection
163
Two Step Overvoltage Protection OV2PTOV
164
Identification
164
Application
164
Setting Guidelines
165
Two Step Residual Overvoltage Protection ROV2PTOV
167
Identification
167
Application
167
Setting Guidelines
168
High Impedance Earthed Systems
168
Power Supply Quality
168
Direct Earthed System
169
Settings for Two Step Residual Overvoltage Protection
170
Loss of Voltage Check LOVPTUV
171
Identification
171
Application
171
Setting Guidelines
172
Advanced Users Settings
172
Advertisement
ABB Relion REQ650 Applications Manual (336 pages)
Breaker Protection, Relion 650 SERIES
Brand:
ABB
| Category:
Protection Device
| Size: 9.03 MB
Table of Contents
Table of Contents
7
Section 1 Introduction
19
This Manual
19
Intended Audience
19
Product Documentation
20
Product Documentation Set
20
Document Revision History
21
Related Documents
22
Document Symbols and Conventions
22
Symbols
22
Document Conventions
23
IEC 61850 Edition 1 / Edition 2 Mapping
24
Section 2 Application
29
General IED Application
29
Back-Up Protection Functions
30
Control and Monitoring Functions
31
Communication
33
Basic IED Functions
35
Section 3 Configuration
37
Description of Configuration REQ650
37
Introduction
37
Description of B11
37
Section 4 Analog Inputs
39
Introduction
39
Setting Guidelines
39
Setting of the Phase Reference Channel
40
Example
40
Setting of Current Channels
40
Example 1
40
Example 2
41
Example 3
42
Examples on How to Connect, Configure and Set CT Inputs for most Commonly Used CT Connections
45
Example on How to Connect a Star Connected Three- Phase CT Set to the IED
46
Example How to Connect Delta Connected Three-Phase CT Set to the IED
50
Example How to Connect Single-Phase CT to the IED
53
Example
55
Relationships between Setting Parameter Base Current, CT Rated Primary Current and Minimum Pickup of a Protection IED
55
Setting of Voltage Channels
55
Examples How to Connect, Configure and Set VT Inputs for most Commonly Used VT Connections
56
Examples on How to Connect a Three Phase-To-Earth Connected VT to the IED
57
Example on How to Connect a Phase-To-Phase Connected VT to the IED
59
Example on How to Connect an Open Delta VT to the IED for High Impedance Earthed or Unearthed Networks
61
Example How to Connect the Open Delta VT to the IED for Low Impedance Earthed or Solidly Earthed Power Systems
64
Section 5 Local HMI
67
Display
68
Leds
70
Keypad
71
Local HMI Functionality
73
Protection and Alarm Indication
73
Parameter Management
74
Front Communication
75
Section 6 Current Protection
77
Instantaneous Phase Overcurrent Protection PHPIOC
77
Identification
77
Application
77
Setting Guidelines
78
Meshed Network Without Parallel Line
78
Meshed Network with Parallel Line
80
Directional Phase Overcurrent Protection, Four Steps OC4PTOC
82
Application
82
Identification
82
Setting Guidelines
83
Settings for each Step
85
Setting Example
88
Instantaneous Residual Overcurrent Protection EFPIOC
93
Application
93
Identification
93
Setting Guidelines
93
Directional Residual Overcurrent Protection, Four Steps EF4PTOC
96
Identification
96
Setting Guidelines
96
Common Settings for All Steps
97
2Nd Harmonic Restrain
98
Parallel Transformer Inrush Current Logic
99
Settings for each Step (X = 1, 2, 3 and 4)
100
Switch Onto Fault Logic
100
Four Step Directional Negative Phase Sequence Overcurrent Protection NS4PTOC
103
Identification
103
Application
103
Setting Guidelines
105
Settings for each Step
105
Common Settings for All Steps
108
Thermal Overload Protection, One Time Constant, Celsius/Fahrenheit LCPTTR/LFPTTR
109
Identification
110
Application
110
Setting Guideline
110
Breaker Failure Protection CCRBRF
111
Identification
112
Application
112
Setting Guidelines
112
Stub Protection STBPTOC
116
Identification
116
Application
116
Setting Guidelines
117
Broken Conductor Check BRCPTOC
118
Identification
118
Application
118
Setting Guidelines
118
Section 7 Voltage Protection
119
Two Step Undervoltage Protection UV2PTUV
119
Identification
119
Application
119
Setting Guidelines
120
Backup Protection for Power System Faults
120
Disconnected Equipment Detection
120
Equipment Protection, such as for Motors and Generators
120
Power Supply Quality
120
Voltage Instability Mitigation
120
Settings for Two Step Undervoltage Protection
121
Two Step Overvoltage Protection OV2PTOV
122
Identification
122
Application
123
Setting Guidelines
123
Equipment Protection, Capacitors
124
Equipment Protection, such as for Motors, Generators, Reactors and Transformers
124
High Impedance Earthed Systems
124
Power Supply Quality
124
The Following Settings Can be Done for the Two Step Overvoltage Protection
124
Two Step Residual Overvoltage Protection ROV2PTOV
127
Application
127
Identification
127
Setting Guidelines
127
Equipment Protection, Capacitors
128
Equipment Protection, such as for Motors, Generators, Reactors and Transformersequipment Protection for Transformers
128
High Impedance Earthed Systems
128
Power Supply Quality
128
Direct Earthed System
129
Settings for Two Step Residual Overvoltage Protection
130
Loss of Voltage Check LOVPTUV
132
Advanced Users Settings
132
Application
132
Identification
132
Setting Guidelines
132
Section 8 Secondary System Supervision
133
Current Circuit Supervision CCSSPVC
133
Identification
133
Application
133
Setting Guidelines
133
Fuse Failure Supervision FUFSPVC
134
Application
134
Identification
134
General
135
Setting Guidelines
135
Setting of Common Parameters
135
Negative Sequence Based
136
Delta U and Delta I
137
Zero Sequence Based
137
Dead Line Detection
138
ABB Relion REQ650 Applications Manual (282 pages)
Breaker protection
Brand:
ABB
| Category:
Circuit breakers
| Size: 5.86 MB
Table of Contents
Table of Contents
7
Introduction
19
This Manual
19
Intended Audience
19
Section 1 Introduction
19
Product Documentation
20
Product Documentation Set
20
Document Revision History
21
Related Documents
21
Document Symbols and Conventions
22
Symbols
22
Document Conventions
23
IEC 61850 Edition 1 / Edition 2 Mapping
23
Application
27
General IED Application
27
Back-Up Protection Functions
27
Section 2 Application
27
Control and Monitoring Functions
28
Communication
30
Basic IED Functions
32
Configuration
35
Description of Configuration REQ650
35
Introduction
35
Description of B11
35
Section 3 Configuration
35
Analog Inputs
37
Introduction
37
Setting Guidelines
37
Setting of the Phase Reference Channel
37
Example
37
Section 4 Analog Inputs
37
Setting of Current Channels
38
Example 1
38
Example 2
39
Example 3
40
Examples on How to Connect, Configure and Set CT Inputs for most Commonly Used CT Connections
42
Example on How to Connect a Star Connected Three-Phase CT Set to the IED
43
Example How to Connect Delta Connected Three-Phase CT Set to the IED
47
Example How to Connect Single-Phase CT to the IED
49
Relationships between Setting Parameter Base Current, CT Rated Primary Current and Minimum Pickup of a Protection IED
50
Setting of Voltage Channels
51
Example
51
Examples How to Connect, Configure and Set VT Inputs for most Commonly Used VT Connections
51
Examples on How to Connect a Three Phase-To-Earth Connected VT to the IED
52
Example on How to Connect a Phase-To-Phase Connected VT to the IED
54
Example on How to Connect an Open Delta VT to the IED for High Impedance Earthed or Unearthed Netwoeks
56
Example How to Connect the Open Delta VT to the IED for Low Impedance Earthed or Solidly Earthed Power Systems
57
Example on How to Connect a Neutral Point VT to the IED
59
Local HMI
63
Section 5 Local HMI
63
Display
64
Leds
65
Keypad
66
Local HMI Functionality
68
Protection and Alarm Indication
68
Front Communication
69
Parameter Management
69
Current Protection
71
Instantaneous Phase Overcurrent Protection PHPIOC
71
Identification
71
Application
71
Setting Guidelines
71
Section 6 Current Protection
71
Meshed Network Without Parallel Line
72
Meshed Network with Parallel Line
74
Four Step Phase Overcurrent Protection OC4PTOC
75
Identification
75
Application
75
Setting Guidelines
76
Settings for each Step
77
Instantaneous Residual Overcurrent Protection EFPIOC
80
Identification
80
Application
80
Setting Guidelines
80
Four Step Residual Overcurrent Protection EF4PTOC
82
Identification
83
Setting Guidelines
83
Settings for each Step (X = 1, 2, 3 and 4)
83
Common Settings for All Steps
85
2Nd Harmonic Restrain
86
Parallel Transformer Inrush Current Logic
86
Switch Onto Fault Logic
87
Four Step Directional Negative Phase Sequence Overcurrent Protection NS4PTOC
88
Identification
88
Application
88
Setting Guidelines
89
Settings for each Step
90
Common Settings for All Steps
92
Sensitive Directional Residual Overcurrent and Power Protection SDEPSDE
93
Identification
93
Application
94
Setting Guidelines
95
Thermal Overload Protection, One Time Constant, Celsius/Fahrenheit LCPTTR/LFPTTR
102
Identification
102
Application
102
Setting Guideline
103
Breaker Failure Protection CCRBRF
104
Identification
104
Application
104
Setting Guidelines
104
Breaker Failure Protection, Single Phase Version CCSRBRF
107
Identification
107
Application
107
Setting Guidelines
107
Stub Protection STBPTOC
109
Identification
109
Application
109
Setting Guidelines
110
Directional Underpower Protection GUPPDUP
111
Identification
111
Application
111
Setting Guidelines
113
Directional Overpower Protection GOPPDOP
116
Identification
116
Application
116
Setting Guidelines
118
Broken Conductor Check BRCPTOC
121
Identification
121
Application
121
Setting Guidelines
121
Advertisement
ABB Relion REQ650 Commissioning Manual (148 pages)
RELION 650 SERIES, Breaker protection
Brand:
ABB
| Category:
Power distribution unit
| Size: 3.54 MB
Table of Contents
Table of Contents
7
Section 1 Introduction
13
This Manual
13
Intended Audience
13
Product Documentation
14
Product Documentation Set
14
Document Revision History
15
Related Documents
16
Document Symbols and Conventions
16
Symbols
16
Document Conventions
17
IEC 61850 Edition 1 / Edition 2 Mapping
18
Section 2 Safety Information
23
Symbols on the Product
23
Warnings
23
Caution Signs
25
Note Signs
25
Section 3 Available Functions
27
Back-Up Protection Functions
27
Control and Monitoring Functions
28
Communication
30
Basic IED Functions
32
Section 4 Starting up
35
Factory and Site Acceptance Testing
35
Commissioning Checklist
35
Checking the Power Supply
36
Energizing the IED
36
Checking the IED Operation
36
IED Start-Up Sequence
37
Setting up Communication between PCM600 and the IED
37
Writing an Application Configuration to the IED
42
Checking CT Circuits
43
Checking VT Circuits
44
Using the RTXP Test Switch
44
Checking the Binary Input/Output Circuits
45
Binary Input Circuits
45
Checking Optical Connections
45
Section 5 Configuring the IED and Changing Settings
47
Overview
47
Configuring Analog CT Inputs
48
Supervision of Input/Output Modules
48
Section 6 Establishing Connection and Verifying the SPA/IEC Communication
51
Entering Settings
51
Entering SPA Settings
51
Entering IEC Settings
51
Verifying the Communication
52
Verifying IEC Communication
52
Verifying SPA Communication
52
Fibre Optic Loop
53
Optical Budget Calculation for Serial Communication with SPA/IEC
53
Section 7 Establishing Connection and Verifying the LON Communication
55
Communication Via the Rear Ports
55
LON Communication
55
The LON Protocol
56
Hardware and Software Modules
56
Optical Budget Calculation for Serial Communication with LON
57
Section 8 Testing IED Operation
59
Preparing for Test
59
Requirements
59
Preparing the IED to Verify Settings
61
Activating the Test Mode
62
Preparing the Connection to the Test Equipment
62
Connecting the Test Equipment to the IED
63
Releasing the Function to be Tested
64
Verifying Analog Primary and Secondary Measurement
65
Testing the Protection Functionality
66
Forcing of Binary Input/Output Signals for Testing
66
Enable Forcing by Using LHMI
66
Forcing Concept
66
How to Enable Forcing
66
Enable Forcing Using TESTMODE Function Block
67
Forcing by Using LHMI
67
How to Change Binary Input/Output Signals Using Forcing
67
Forcing by Using PCM600
69
How to Undo Forcing Changes and Return the IED to Normal Operation
71
Undo Forcing by Using LHMI
71
Undo Forcing by Using PCM600
71
Undo Forcing by Using TESTMODE Component
71
ABB Relion REQ650 Commissioning Manual (150 pages)
Breaker protection
Brand:
ABB
| Category:
Protection Device
| Size: 1.55 MB
Table of Contents
Table of Contents
9
Section 1 Introduction
15
This Manual
15
Intended Audience
15
Product Documentation
16
Product Documentation Set
16
Document Revision History
17
Related Documents
17
Symbols and Conventions
18
Symbols
18
Document Conventions
19
Section 2 Available Functions
21
Back-Up Protection Functions
21
Control and Monitoring Functions
22
Station Communication
26
Basic IED Functions
27
Section 3 Starting up
29
Factory and Site Acceptance Testing
29
Commissioning Checklist
29
Checking the Power Supply
30
Energizing the IED
30
Checking the IED Operation
30
IED Start-Up Sequence
30
Setting up Communication between PCM600 and the IED
31
Writing an Application Configuration to the IED
37
Checking CT Circuits
38
Checking VT Circuits
39
Using the RTXP Test Switch
39
Checking Binary Input and Output Circuits
40
Binary Input Circuits
40
Binary Output Circuits
40
Checking Optical Connections
40
Section 4 Establishing Connection and Verifying the IEC 61850 Station Communication
43
Setting the Station Communication
43
Verifying the Station Communication
43
Section 5 Testing IED Operation
45
Preparing the IED to Verify Settings
45
Activating the Test Mode
47
Preparing the Connection to the Test Equipment
47
Connecting the Test Equipment to the IED
48
Releasing the Function to be Tested
49
Verifying Analog Primary and Secondary Measurement
50
Testing the Protection Functionality
51
Section 6 Testing Functionality
53
Testing Disturbance Report
53
Introduction
53
Disturbance Report Settings
53
Identifying the Function to Test in the Technical Reference Manual
53
Testing Current Protection Functions
54
Completing the Test
54
Instantaneous Phase Overcurrent Protection 3-Phase Output PHPIOC (50)
54
Measuring the Operate Limit of Set Values
54
Completing the Test
55
Four Step Phase Overcurrent Protection 3-Phase Output OC4PTOC (51_67)
55
Instantaneous Phase Overcurrent Protection Phase Segregated Output SPTPIOC (50)
55
Verifying the Settings
56
Completing the Test
57
Four Step Phase Overcurrent Protection Phase Segregated Output OC4SPTOC (51_67)
57
Verifying the Settings
57
Completing the Test
58
Instantaneous Residual Overcurrent Protection EFPIOC (50N)
58
Completing the Test
59
Four Step Directional Residual Overcurrent Protection
59
Four Step Residual Overcurrent Protection, Zero or Negative Sequence Direction EF4PTOC (51N/67N)
59
Measuring the Operate Limit of Set Values
59
Completing the Test
60
Four Step Non-Directional Residual Overcurrent Protection
60
Sensitive Directional Residual Overcurrent and Power Protection SDEPSDE (67N)
61
Measuring the Operate and Time Limit for Set Values
61
Completing the Test
66
Thermal Overload Protection, One Time Constant, Fahrenheit/Celsius LFPTTR/LCPTTR (26)
66
Testing the Protection Without External Temperature Compensation (Noncomp)
66
Completing the Test
67
Breaker Failure Protection, Phase Segregated Activation and Output CCRBRF (50BF)
67
Checking the Phase Current Operate Value, Pickup_Ph
68
Checking the Residual (Ground Fault) Current Operate Value
68
Pickup_N Set below Pickup_Ph
68
Checking the Re-Trip and Back-Up Times
68
Verifying the Re-Trip Mode
69
Verifying the Back-Up Trip Mode
70
Verifying the Case Retripmode = Contact
71
Verifying the Function Mode Current&Contact
71
Completing the Test
72
Breaker Failure Protection, Phase Segregated Activation and Output CSPRBRF (50BF)
72
Checking the Phase Current Operate Value, Pickup_Ph
73
Checking the Residual (GF) Current Operate Value IN> Set below IP
73
Checking the Re-Trip and Back-Up Times
73
Verifying the Retripmode
74
Verifying the Case Retripmode = no CB Pos Check
75
Verifying the Function Mode Current&Contact
75
Checking the Case with Fault Current below Set Value Pickup
75
Blkcont
76
Checking the Phase Current Operate Value, Pickup_Ph
76
Completing the Test
76
Stub Protection STBPTOC (50STB)
76
Measuring the Operate Limit of Set Values
77
Completing the Test
77
Pole Discrepancy Protection CCRPLD (52PD)
78
Verifying the Settings
78
Completing the Test
78
Broken Conductor Check BRCPTOC (46)
78
Measuring the Operate and Time Limit of Set Values
79
Completing the Test
79
Directional Underpower Protection GUPPDUP (37)
79
Verifying the Settings
80
Completing the Test
81
Completing the Test
82
Directional Overpower Protection GOPPDOP (32)
82
Verifying the Settings
82
Testing Voltage Protection Functions
83
Two Step Undervoltage Protection UV2PTUV (27)
83
Verifying the Setting
83
Completing the Test
84
Two Step Overvoltage Protection OV2PTOV (59)
85
Verification of Single-Phase Voltage and Time Delay to Operate for Step 1
85
Completing the Test
86
Two Step Residual Overvoltage Protection ROV2PTOV (59N)
86
Verifying the Settings
86
Completing the Test
87
Loss of Voltage Check LOVPTUV (27)
87
Completing the Test
88
Measuring the Operate Limit of Set Values
88
Testing Frequency Protection Functions
89
Underfrequency Protection SAPTUF (81)
89
Verifying the Settings
89
Completing the Test
90
Overfrequency Protection SAPTOF (81)
91
Verifying the Settings
91
Completing the Test
92
Completing the Test
93
Rate-Of-Change Frequency Protection SAPFRC (81)
93
Verifying the Settings
93
Testing Secondary System Supervision Functions
94
Completing the Test
94
Current Circuit Supervision CCSRDIF (87)
94
Fuse Failure Supervision SDDRFUF
94
Verifying the Settings
94
Checking that the Binary Inputs and Outputs Operate as Expected
95
Measuring the Operate Value for the Negative Sequence Function
96
Measuring the Operate Value for the Zero-Sequence Function
96
Checking the Operation of the DV/Dt and DI/Dt Based Function
97
Completing the Test
98
Testing Control Functions
98
Synchrocheck, Energizing Check, and Synchronizing SESRSYN (25)
98
Testing the Synchronizing Function
101
Testing the Synchrocheck Check
102
Testing the Energizing Check
106
Testing the Voltage Selection
107
Autorecloser for 3-Phase Operation SMBRREC (79)
108
Completing the Test
108
Preparation of the Verification
110
Switching the Autorecloser for 3-Phase Operation Function to Enabled and Disabled
111
Verifying the Autorecloser for 3-Phase Operation Function SMBRREC (79)
111
Checking the Reclosing Conditions
112
Autorecloser for 1/3-Phase Operation STBRREC (79)
113
Completing the Test
113
Preparation of the Verification
116
Switching the Auto-Reclosing Function Enabled and Disabled
117
Verifying the Auto-Reclosing Function
117
Check Closing Onto a Fault
118
Checking the Influence of CB Not Ready for Reclosing
118
Checking the Influence of the INHIBIT Signal
118
Checking the Reclosing Conditions
118
Checking the Influence of Synchronism Check (at Three-Pole Reclosing)
119
Completing the Test
119
Interlocking
119
Restoring Equipment
119
Testing Logic Functions
120
Circuit Breaker Lockout
120
Three-Phase Operating Mode
120
Tripping Logic, Common 3-Phase Output SMPPTRC (94)
120
1P/3P Operating Mode
121
Completing the Test
121
Tripping Logic Phase Segregated Output SPTPTRC (94)
121
Circuit Breaker Lockout
122
Completing the Test
123
Event Counter CNTGGIO
123
Limit Counter L4UFCNT
123
Testing Monitoring Functions
123
Completing the Test
124
Establishing Connection and Verifying the IEC 61850 Communication
124
Overview
124
Pulse Counter PCGGIO
124
Testing Metering Functions
124
Testing Station Communication
124
Setting the Station Communication
125
Exit Test Mode
126
Verifying the Station Communication
126
ABB Relion REQ650 Commissioning Manual (128 pages)
Breaker protection
Brand:
ABB
| Category:
Protection Device
| Size: 2.63 MB
Table of Contents
Table of Contents
7
Introduction
13
This Manual
13
Presumptions for Technical Data
13
Intended Audience
13
Product Documentation
14
Product Documentation Set
14
Document Revision History
15
Related Documents
15
Document Symbols and Conventions
16
Symbols
16
Document Conventions
17
IEC 61850 Edition 1 / Edition 2 Mapping
17
Safety Information
21
Symbols on the Product
21
Warnings
21
Caution Signs
22
Note Signs
23
Available Functions
25
Back-Up Protection Functions
25
Control and Monitoring Functions
26
Communication
28
Basic IED Functions
30
Starting up
33
Factory and Site Acceptance Testing
33
Commissioning Checklist
33
Checking the Power Supply
34
Energizing the IED
34
Checking the IED Operation
34
IED Start-Up Sequence
34
Setting up Communication between PCM600 and the IED
35
Writing an Application Configuration to the IED
39
Checking CT Circuits
39
Checking VT Circuits
40
Using the RTXP Test Switch
40
Checking the Binary Input/Output Circuits
41
Binary Input Circuits
41
Checking Optical Connections
41
Configuring the IED and Changing Settings
43
Overview
43
Configuring Analog CT Inputs
43
Supervision of Input/Output Modules
44
Establishing Connection and Verifying the SPA/IEC Communication
45
Entering Settings
45
Entering SPA Settings
45
Entering IEC Settings
45
Verifying the Communication
46
Verifying SPA Communication
46
Verifying IEC Communication
46
Fiber Optic Loop
46
Optical Budget Calculation for Serial Communication with SPA/IEC
47
Establishing Connection and Verifying the LON Communication
49
Communication Via the Rear Ports
49
LON Communication
49
The LON Protocol
50
Hardware and Software Modules
50
Optical Budget Calculation for Serial Communication with LON
51
Testing IED Operation
53
Preparing for Test
53
Requirements
53
Preparing the IED to Verify Settings
54
Activating the Test Mode
55
Preparing the Connection to the Test Equipment
55
Connecting the Test Equipment to the IED
56
Releasing the Function to be Tested
57
Verifying Analog Primary and Secondary Measurement
58
Testing the Protection Functionality
58
Forcing of Binary Input/Output Signals for Testing
58
Forcing Concept
58
How to Enable Forcing
59
Enable Forcing by Using LHMI
59
Enable Forcing Using TESTMODE Function Block
59
How to Change Binary Input/Output Signals Using Forcing
59
ABB Relion REQ650 Commissioning Manual (120 pages)
Breaker protection
Brand:
ABB
| Category:
Relays
| Size: 3.01 MB
Table of Contents
Table of Contents
7
Introduction
13
Intended Audience
13
This Manual
13
Product Documentation
14
Product Documentation Set
14
Document Revision History
15
Related Documents
15
Manual Conventions
16
Safety Information
19
Safety Indication Symbols
16
Symbols and Conventions
16
Symbols on the Product
19
Warnings
19
Caution Signs
20
Note Signs
21
Available Functions
23
Back-Up Protection Functions
23
Control and Monitoring Functions
24
Designed to Communicate
26
Basic IED Functions
27
Starting up
29
Commissioning Checklist
29
Factory and Site Acceptance Testing
29
Checking the IED Operation
30
Checking the Power Supply
30
Energizing the IED
30
IED Start-Up Sequence
30
Setting up Communication between PCM600 and the IED
31
Writing an Application Configuration to the IED
35
Checking CT Circuits
36
Checking VT Circuits
36
Checking Binary Input and Output Circuits
37
Checking the RTXP Test Switch
37
Binary Input Circuits
38
Binary Output Circuits
38
Checking Optical Connections
38
Establishing Connection and Verifying the IEC 61850 Station Communication
39
Setting the Station Communication
39
Verifying the Communication
39
Testing IED Operation
41
Preparing the IED to Verify Settings
41
Activating Test Mode
42
Connecting Test Equipment to the IED
43
Preparing the Connection to the Test Equipment
43
Releasing the Function to be Tested
44
Verifying Analog Primary and Secondary Measurement
45
Testing Protection Functionality
46
Testing Functionality
47
Disturbance Report Settings
47
Identifying the Function to Test in the Technical Reference Manual
47
Instantaneous Phase Overcurrent Protection PHPIOC (50)
47
Introduction
47
Testing Current Protection Functions
47
Testing Disturbance Report
47
Completing the Test
48
Instantaneous Phase Overcurrent Protection SPTPIOC (50)
48
Measuring the Operate Limit of Set Values
48
Completing the Test
49
Four Step Phase Overcurrent Protection OC4PTOC (51_67)
49
Verifying the Settings
49
Completing the Test
50
Four Step Phase Overcurrent Protection OC4SPTOC (51_67)
50
Verifying the Settings
50
Completing the Test
51
Instantaneous Residual Overcurrent Protection EFPIOC (50N)
51
Measuring the Operate Limit of Set Values
51
Completing the Test
52
Four Step Directional Residual Overcurrent Protection
52
Four Step Non-Directional Residual Overcurrent Protection
52
Four Step Residual Overcurrent Protection EF4PTOC (51N/67N)
52
Measuring the Operate and Time Limit for Set Values
53
Sensitive Directional Residual Overcurrent and Power Protection SDEPSDE (67N)
53
Completing the Test
57
Thermal Overload Protection, One Time Constant LPTTR (26)
57
Breaker Failure Protection CCRBRF (50BF)
58
Checking the Phase Current Operate Value, Pickup_Ph
58
Checking the Residual (Ground Fault) Current Operate Value Pickup_N Set below
58
Pickup_Ph
58
Checking the Re-Trip and Back-Up Times
59
Verifying the Re-Trip Mode
59
Verifying the Back-Up Trip Mode
60
Verifying the Case Retripmode = Contact
60
Completing the Test
61
Verifying the Function Mode Current&Contact
61
Breaker Failure Protection CSPRBRF (50BF)
62
Checking the Phase Current Operate Value, Pickup_Ph
62
Checking the Re-Trip and Back-Up Times
62
Checking the Residual (GF) Current Operate Value IN> Set below IP
62
Verifying the Case Retripmode = no CB Pos Check
63
Verifying the Retripmode
63
Checking the Case with Fault Current below Set Value Pickup_Blkcont
64
Checking the Phase Current Operate Value, Pickup_Ph
64
Verifying the Function Mode Current&Contact
64
Completing the Test
65
Measuring the Operate Limit of Set Values
65
Stub Protection STBPTOC (50STB)
65
Completing the Test
66
Pole Discrepancy Protection CCRPLD (52PD)
66
Verifying the Settings
66
Broken Conductor Check BRCPTOC (46)
67
Completing the Test
67
Directional Underpower Protection GUPPDUP (37)
67
Measuring the Operate and Time Limit of Set Values
67
Verifying the Settings
68
Completing the Test
69
Directional Overpower Protection GOPPDOP (32)
69
Verifying the Settings
69
Completing the Test
70
Testing Voltage Protection Functions
70
Two Step Undervoltage Protection UV2PTUV (27)
70
Verifying the Setting
70
Completing the Test
71
Two Step Overvoltage Protection OV2PTOV (59)
71
Verifying the Settings
71
Completing the Test
72
Loss of Voltage Check LOVPTUV (27)
72
Measuring the Operate Limit of Set Values
72
Two Step Residual Overvoltage Protection ROV2PTOV (59N)
72
Verifying the Settings
72
Completing the Test
73
Testing Frequency Protection Functions
73
Underfrequency Protection SAPTUF (81)
73
Verifying the Settings
73
Completing the Test
74
Overfrequency Protection SAPTOF (81)
74
Verifying the Settings
74
Completing the Test
75
Rate-Of-Change Frequency Protection SAPFRC (81)
75
Verifying the Settings
75
Completing the Test
76
Current Circuit Supervision CCSRDIF (87)
76
Testing Secondary System Supervision Functions
76
Verifying the Settings
76
Checking that the Binary Inputs and Outputs Operate as Expected
77
Completing the Test
77
Fuse Failure Supervision SDDRFUF
77
Measuring the Operate Value for the Negative Sequence Function
78
Measuring the Operate Value for the Zero-Sequence Function
78
Checking the Operation of the DV/Dt and DI/Dt Based Function
79
Completing the Test
79
Synchrocheck, Energizing Check, and Synchronizing SESRSYN (25)
80
Testing Control Functions
80
Testing the Synchronizing Function
81
Testing the Synchrocheck Check
82
Testing the Energizing Check
84
Autorecloser SMBRREC (79)
85
Completing the Test
85
Testing the Voltage Selection
85
Preparation of the Verification
87
Checking the Reclosing Conditions
88
Switching the Autorecloser Function to Enabled and Disabled
88
Verifying the Autorecloser Function SMBRREC (79)
88
Completing the Test
89
Autorecloser STBRREC (79)
90
Preparation of the Verification
92
Checking the Reclosing Conditions
93
Switching the Auto-Reclosing Function Enabled and Disabled
93
Verifying the Auto-Reclosing Function
93
Check Closing Onto a Fault
94
Checking the Influence of CB Not Ready for Reclosing
94
Checking the Influence of Synchronism Check (at Three-Pole Reclosing)
94
Checking the Influence of the INHIBIT Signal
94
Restoring Equipment
94
Circuit Breaker Lockout
95
Completing the Test
95
Testing Logic Functions
95
Three Phase Operating Mode
95
Tripping Logic SMPPTRC (94)
95
1P/3P Operating Mode
96
Completing the Test
96
Tripping Logic SPTPTRC (94)
96
Circuit Breaker Lockout
97
Completing the Test
97
Event Counter CNTGGIO
97
Testing Monitoring Functions
97
Exit Test Mode
98
ABB Relion REQ650 Operation Manual (66 pages)
Brand:
ABB
| Category:
Protection Device
| Size: 4.52 MB
Table of Contents
Table of Contents
7
Introduction
11
This Manual
11
Intended Audience
11
Product Documentation
12
Product Documentation Set
12
Document Revision History
13
Related Documents
13
Document Symbols and Conventions
15
Symbols
15
Document Conventions
16
Safety Information
17
Symbols on the Product
17
Warnings
17
Caution Signs
18
Note Signs
19
Environmental Aspects
21
Sustainable Development
21
Disposing of the IED
21
Using the HMI
23
Using the Local HMI
23
On-Screen Keyboard
23
Logging on
24
Logging off
26
Turning the Display Backlight on
26
Identifying the Device
26
Adjusting the Display Contrast
27
Navigating in the Menu
27
Menu Structure
27
Scrolling the Display
28
Changing the Default View
28
Browsing Setting Values
28
Editing Values
29
Editing Numerical Values
29
Editing String Values
30
Editing Enumerated Values
30
Changing Time Settings in LHMI
30
Saving Settings
31
Clearing and Acknowledging
31
Using the Local HMI Help
31
IED Operation
33
Normal Operation
33
Disturbance Identification
33
Disturbance Recording Triggering
33
Disturbance Record Analysis
33
Disturbance Reports
34
IED Self-Supervision
34
Non-Operative Functions
34
IED Parameterization
35
IED Settings for IED Functionality
35
ABB Relion REQ650 Product Manual (96 pages)
Relion 650 series Breaker protection
Brand:
ABB
| Category:
Power distribution unit
| Size: 2.23 MB
Table of Contents
Table of Contents
2
Series Overview
3
Application
3
Available Functions
7
Current Protection
17
Voltage Protection
19
Frequency Protection
20
Secondary System Supervision
20
Control
21
Logic
22
Monitoring
24
Metering
26
Human Machine Interface
26
Basic IED Functions
26
Station Communication
27
Hardware Description
29
Connection Diagrams Customized
30
Connection Diagrams Configured
35
Technical Data
53
Ordering for Customized IED
85
Ordering for Configured IED
89
Ordering for Accessories
92
ABB Relion REQ650 Manual (96 pages)
RELION DNP, 650 series Version 2.2
Brand:
ABB
| Category:
Protection Device
| Size: 2.99 MB
Table of Contents
Table of Contents
7
Section 1 Introduction
9
This Manual
9
Intended Audience
9
Product Documentation
10
Product Documentation Set
10
Document Revision History
11
Related Documents
12
Document Symbols and Conventions
13
Symbols
13
Document Conventions
14
Section 2 DNP3 Data Mappings
17
Overview
17
Point List for the Ieds
17
BI4 Binary Input
28
Section 3 DNP3 Protocol Implementation
33
DNP3 Device Profile
33
DNP3 Implementation Table
77
Section 4 Glossary
85
Glossary
85
ABB Relion REQ650 Product Manual (91 pages)
Breaker protection REQ650 ANSI
Brand:
ABB
| Category:
Protection Device
| Size: 2.69 MB
Table of Contents
Table of Contents
2
Series Overview
3
Application
3
Available Functions
7
Current Protection
16
Voltage Protection
19
Frequency Protection
19
Secondary System Supervision
20
Control
21
Logic
22
Monitoring
24
Metering
26
Human Machine Interface
27
Basic IED Functions
27
Station Communication
28
Hardware Description
30
Connection Diagrams
33
Technical Data
43
Phpioc
53
Sptpioc
54
Oc4Ptoc
55
Lpttr
61
Guppdup
64
Issued: April
65
Ordering
85
ABB Relion REQ650 Product Manual (72 pages)
Relion 650 series Breaker protection 2.1 IEC
Brand:
ABB
| Category:
Power Tool
| Size: 2.09 MB
Table of Contents
Table of Contents
2
Application
3
Available Functions
5
Current Protection
5
Voltage Protection
5
Multipurpose Protection
5
Secondary System Supervision
6
Control
6
Logic
6
Monitoring
7
Metering
7
Human Machine Interface
18
Basic IED Functions
19
Station Communication
19
Hardware Description
19
Connection Diagrams
22
Technical Data
23
Fuse Failure Supervision
42
Elapsed Time Integrator with Limit Transgression and Overflow Supervision
49
Measurements
51
Measurements
52
Disturbance Report
53
Pulse-Counter Logic
57
Ordering for Pre-Configured IED
65
Ordering for Accessories
68
ABB Relion REQ650 Product Manual (57 pages)
Breaker protection
Brand:
ABB
| Category:
Industrial Equipment
| Size: 3.04 MB
Table of Contents
Table of Contents
2
Series Overview
3
Application
3
Available Functions
7
Current Protection
11
Voltage Protection
13
Frequency Protection
14
Secondary System Supervision
14
Control
15
Sesrsyn
15
Smbrrec
15
Stbrrec
15
Locremctrl
15
Dpggio
15
Bay Control
15
Logic Rotating Switch for Function Selection and LHMI
15
IEC 61850 Generic Communication I/O Functions
15
Logic
16
Single Point Generic Control 8 Signals
16
Monitoring
17
Metering
18
Human Machine Interface
19
Basic IED Functions
19
Iec60870-5-103
19
Station Communication
20
Hardware Description
21
Connection Diagrams
22
Technical Data
23
Ordering
51
Advertisement
Related Products
ABB REQ650 1.3 IEC
ABB REF601
ABB REL650 series
ABB REA 105
ABB REL 501-C1 2.5
ABB REL650 A12
ABB REG670 C30
ABB REG670 Customized
ABB REG316 4 Series
ABB RET 670
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL