ABB Relion 650 Series Technical Manual page 85

Bay control
Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

1MRK 511 424-UEN B
Bay control REC650 2.2 IEC
Technical manual
Activating
signal 1
Activating
signal 2
LED 1
LED 2
Automatic
reset
Manual
reset
IEC01000239 V2 EN-US
Figure 26:
Operating sequence 6 (LatchedReset-S), two indications within
same disturbance
Figure
27
shows the timing diagram for a new indication after tRestart time has
elapsed.
Activating
signal 1
Activating
signal 2
LED 1
LED 2
Automatic
reset
Manual
reset
IEC01000240 V2 EN-US
Figure 27:
Operating sequence 6 (LatchedReset-S), two different
disturbances
Local Human-Machine-Interface LHMI
Disturbance
tRestart
Disturbance
tRestart
Section 5
IEC01000239_2-en.vsd
Disturbance
tRestart
IEC01000240_2_en.vsd