Thermo Scientific Dionex ICS-5000 Operator's Manual page 414

Ion chromatography system
Table of Contents

Advertisement

Dionex ICS-5000 Operator's Manual
10. Start the pump flow.
11. Turn on the DC power.
12. Wait until the pump pressure has stabilized (30 to 60 seconds) and then
turn on the cell voltage.
Installing the pH-Ag/AgCl Reference Electrode in the Cell for an
Analytical IC System
1. To avoid any hydraulic pressure buildup when inserting the reference
electrode into the cell, make sure that fitting plugs are not installed on the
cell inlet and outlet fittings.
2. Verify that the pH-Ag/AgCl reference electrode O-ring is present (see
Figure
reference electrode well and tighten it fingertight (see
3.
Orient the cell assembly with the yoke knob on the left (see
and push the cell onto its mounting location in the DC compartment.
4.
Reconnect the cell inlet and outlet lines.
5.
Start the pump flow.
6.
Turn on the DC power.
7.
Wait until the pump pressure has stabilized (30 to 60 seconds) and then
turn on the cell voltage.
398
9-63) and then screw the pH-Ag/AgCl reference electrode into the
Figure 9-63. pH-Ag/AgCl reference electrode O-Ring
Figure
9-62).
pH-Ag/AgCl
Reference
Electrode
O-Ring
Figure
9-52)
Doc. 065342-06 12/11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents