Thermo Scientific Dionex ICS-5000 Operator's Manual page 354

Ion chromatography system
Table of Contents

Advertisement

Dionex ICS-5000 Operator's Manual
If you are removing an analytical EGC:
a. Remove the
from the EGC by
unscrewing the 10-32 luer
adapter (see
NOTE
b. Locate the 10-32 plug (P/N 053981) removed from the EGC vent
opening during installation. Install the plug into the vent opening.
6. Lift the EGC straight up and off the cartridge holder.
7. Turn the EGC upside
down and place it on the
EG drip tray (see
Figure
"service position" for the
cartridge.
8. Disconnect the
ports on the EGC.
338
VENT
line
Figure
9-16).
If necessary, use a
wrench to hold the
luer adapter in place
while unscrewing the
vent line.
9-17). This is the
EGC IN
EGC OUT
and
EGC
Vent Line
Luer
Adapter
Figure 9-16. Analytical EGC Vent Line
Generation
Chamber
Electrolyte
Reservoir
Figure 9-17. EGC in the Service Position
(Analytical Version Shown)
lines from the
Drip Tray
INLET
OUTLET
and
Doc. 065342-06 12/11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents