Thermo Scientific Dionex ICS-5000 Operator's Manual page 303

Ion chromatography system
Table of Contents

Advertisement

8 • TC Troubleshooting
Next qualification of this module is overdue (due date was [date]).
-or-
Next qualification of this module was due on [date]. Allowing x
more grace day(s).
-or-
Next qualification of this module is overdue (due date was [date]).
Module may no longer be used.
Chromeleon monitors the date on which qualification was last performed and
displays an appropriate message (shown above) at the following times: when
the due date for the next qualification is approaching; when the due date is
overdue, but the TC can still be used; and when the due date is overdue and
the TC can no longer be used.
The Qualification.WarningPeriod property determines the number of days
before the due date that the warning is first displayed. The
Qualification.GracePeriod property determines for how many days after the
due date you can continue using the TC without performing the qualification.
To troubleshoot:
Contact Technical Support for Dionex products to schedule an Operational
Qualification and Performance Qualification.
Next service of this module is due in x day(s) (due date is [date]).
-or-
Next service of this module is overdue (due date was [date]).
Chromeleon monitors the date on which service was last performed and
display an appropriate message (shown above) at the following times: when
the due date for the next service is approaching and when the due date is
overdue. The Service.WarningPeriod property determines the number of
days before the due date that the warning is first displayed.
To troubleshoot:
Contact Technical Support for Dionex products for information about
performing annual preventive maintenance.
287
Doc. 065342-06 12/11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents