Thermo Scientific Dionex ICS-5000 Operator's Manual page 363

Ion chromatography system
Table of Contents

Advertisement

9. Slide the EGC (with the
electrolyte reservoir on top)
into the holder in the EG
(see
Figure
10. Push the EGC electrical cable firmly into the
connector (see
fingertight to secure it.
11. Remove the 10-32 plug from the EGC vent opening. Install a 10-32 luer
adapter in the vent opening.
12. Connect the luer adapter and
the vent opening in the new cartridge (see
13. Place the 10-32 plug removed from the vent opening in a safe place for
storage. The 10-32 plug is required for shipping or storing the cartridge.
To ensure proper ventilation, always connect the vent line to the
analytical EGC before operation.
Doc. 065342-06 12/11
9-24).
Figure 9-24. Analytical EGC Installed on Holder
Figure
9-14). Twist the ring on the cable connector
VENT
EGC 1
EGC 2
(or
line removed from the old cartridge to
Figure
9-16).
9 • EG Service
) bulkhead
347

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents