Thermo Scientific Dionex ICS-5000 Operator's Manual page 368

Ion chromatography system
Table of Contents

Advertisement

Dionex ICS-5000 Operator's Manual
b. Refer to
From EGC Out Port
4. On the Chromeleon 7 ePanel Set or Chromeleon 6.8 panel tabset, select
the following settings:
a. DC panel: Verify that the suppressor Mode is off.
To avoid damaging the suppressor, always turn off the suppressor
before hydrating the CR-TC. The pump flow is on during conditioning;
however, no flow reaches the suppressor.
b. Pump panel:
352
Figure 9-27
to plumb the four ports on the CR-TC.
To RFIC Eluent Degasser
To CR-TC
Eluent In
(red label)
CR-TC Hydration Kit
Tubing Assembly
(P/N 063487)
(Temporary connection)
Figure 9-27. Plumbing for Hydrating an Analytical CR-TC
Gradient pump only: Select the correct eluent channel (A, B, C,
or D).
Analytical pumps: Set the flow rate recommended for your
application. This turns on the pump flow, also. Allow the pump to
run for at least 10 minutes.
Capillary pumps: Set the flow rate to 0.02 mL/min. This turns
on the pump flow, also. Allow the pump to run for 15 minutes.
Analytical CR-TC Flushing:
Regen In Port
Pump at application flow rate
for 10 min
TO CR
-
TC
REGEN OUT
(blue label)
Eluent Out
(yellow label)
Regen In
(orange label)
Doc. 065342-06 12/11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents