Thermo Scientific Dionex ICS-5000 Operator's Manual page 344

Ion chromatography system
Table of Contents

Advertisement

Dionex ICS-5000 Operator's Manual
8. Connect the new tubing pieces
to the seal wash reservoir and
pump heads (see
9. Push the tubing onto the fitting
that was removed in
10. Connect the PharMed tubing to
the peristaltic pump as follows:
a. Push the tubing into the
lower notch on the pump
mounting plate.
b. Lift the lever to the right and
hold it in that position with
one hand.
c. With your other hand, wind
the tubing around the rotor.
d. Release the lever.
e. Pull on the fitting slightly to slide the tubing into the upper notch.
f.
Make sure there is no slack in the tubing. If necessary, lift the lever
again, adjust the tubing around the rotor and through the lower notch
to remove any slack, and release the lever.
11. Push the component mounting panel back into the enclosure. Close the
DP/SP door.
12. Turn on the pump flow.
328
Figure
9-10).
Step
5.
Secondary
Figure 9-10. Piston Seal Wash Tubing Connections
PharMed
Tubing
Tygon 2075
Tubing
Primary
Head
Head
Doc. 065342-06 12/11
Seal
Wash
Reservoir

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents