Thermo Scientific Dionex ICS-5000 Operator's Manual page 362

Ion chromatography system
Table of Contents

Advertisement

Dionex ICS-5000 Operator's Manual
2. Verify that a plug is installed in the vent port. This will prevent leakage
from the vent opening when you turn over the cartridge.
3. Turn the cartridge upside down and place it on the EG drip tray in the
service position (see
4. Remove the plugs from the
generation chamber.
5. Connect the
6. Locate the yellow 0.5 mL/min, 7 MPa (1000 psi) backpressure coil
(P/N 053765) in the EG Ship Kit (P/N 072047).
7. Connect one end of the
backpressure coil to the EGC
OUTLET
leave the other end of the coil
unconnected. This is a
temporary connection.
8. While holding the EGC right-side up (with the electrolyte reservoir on
top), shake the cartridge vigorously and tap it with the palm of your hand
10 to 15 times. Make sure any bubbles trapped in the eluent generation
chamber are dislodged.
346
Figure
9-17).
INLET
EGC IN
line from the pump to the EGC
port (see
Figure
9-23);
Figure 9-23. Analytical EGC Outlet Connection
OUTLET
and
fittings on the eluent
INLET
EGC
Outlet
Port
for Conditioning Procedure
port.
Backpressure
Coil
Doc. 065342-06 12/11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents