Thermo Scientific Dionex ICS-5000 Operator's Manual page 358

Ion chromatography system
Table of Contents

Advertisement

Dionex ICS-5000 Operator's Manual
8. Slide the EGC (with the electrolyte
reservoir on top) into the cartridge
holder (see
9. Push the EGC electrical cable firmly into the
connector (see
fingertight to secure it.
10. Unscrew the fitting on the top of the EGC a few turns to vent the EGC.
To ensure proper ventilation, always loosen the fitting on the top of the
capillary EGC before operation.
11. On the Chromeleon 7 ePanel Set or Chromeleon 6.8 panel tabset, select
the following settings:
a. DC panel: Verify that the suppressor Mode is off.
b. EG panel: Verify that the CR-TC is off.
To avoid damaging the suppressor and CR-TC, always turn them off
before flushing the EGC. The pump flow is on during flushing; however,
no flow reaches the suppressor or CR-TC.
c. Pump panel: Set the flow rate to 0.02 mL/min. This turns on the
pump flow, also.
12. Flush the capillary EGC for 20 minutes and then turn off the pump flow.
13. Disconnect the temporary tubing from the EGC
342
Figure
9-20).
Figure 9-20. Capillary EGC Installed on Holder
Figure
9-14). Twist the ring on the cable connector
EGC 1
EGC 2
(or
) bulkhead
OUTLET
port.
Doc. 065342-06 12/11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents