2. Verify that the vent fitting on top of the EGC is tightened.
3. Turn the cartridge upside down and place it on the EG drip tray.
4. Remove the plugs from the
generation chamber.
5. Locate the 38 cm (15 in) piece of 0.025 mm (0.001 in) ID tan PEEK
tubing (P/N 074582) in the EG Ship Kit (P/N 072047).
6. Connect this line to the EGC
EGC IN
temporary connection, to provide backpressure during the EGC setup
procedure.
7. Connect a piece of 0.25 mm (0.010 in) ID black PEEK tubing to the EGC
OUTLET
temporary connection.
Electrolyte Reservoir
Electrolyte Generation
Figure 9-19. Flow Schematic for Flushing the Capillary EGC
Doc. 065342-06 12/11
line from the pump pulse damper (see
port. Direct the other end of the tubing to waste. This is a
EGC
(Capillary)
Chamber
EGC
OUT
0.25 mm (0.010 in)
ID
PEEK tubing
(Temporary
connection)
INLET
OUTLET
and
fittings on the eluent
INLET
port and connect the other end to the
Figure
Capillary EGC Flushing:
Pump at 0.02 mL/min for 20 min
EGC
IN
38 cm (15 in) of 0.025 mm
(0.001 in) ID tan
PEEK tubing
(Temporary connection
for backpressure)
Pump Outlet
Tubing Assembly
(P/N 068658)
TO PUMP/DAMPER
9 • EG Service