41.7.2
Description
Diagram
Requirements
Reference Line
Working Example
Application:
The positions of bore-holes need to be staked out in a regular grid
over the area of a site to be used for landfill.
Reference line/arc:
Two known points on the site can be used to define the reference line.
Working technique:
Real-time kinematic.
P1
GPS12_133
•
A new reference line needs to be created and saved with the job.
•
<Write Logfile: Yes> in REFLINE Configuration, Logfile page.
•
A real-time reference is running.
•
For the rover: <R-Time Mode: Rover> in CONFIGURE Real-Time Mode.
d2
d1
P0 Start point
P0
P1 End point
d1
d2
GPS1200
<Increment By:>
<Line Offsets:>
1083