Agilent Technologies N9360A Programming Manual page 104

Multi ue tester, gsm programming
Hide thumbs Also See for N9360A:
Table of Contents

Advertisement

Programming Command Reference
5
5-46
Phase Error Test (Peak)
CONFigure:SEQuence:PHASe:PEAK <int>
CONFigure:SEQuence:PHASe:PEAK?
This command sets whether to execute the Peak Phase Error
test in the test sequence on the six measurement channels.
<int> sets whether to execute this test on each Traffic Channel
by the total sum of the 6 bits as follows.
bit 0 (1): Testing on the TCH1
bit 1 (2): Testing on the TCH2
bit 2 (4): Testing on the TCH3
bit 3 (8): Testing on the TCH4
bit 4 (16): Testing on the TCH5
bit 5 (32): Testing on the TCH6
The value in the parentheses is decimal value for each bit. Refer
to
Setting and Querying the Registers
The set of each bit is 1 for Run and 0 for — (skip). At preset, this
is set to 63.
This query command returns the set of Peak Phase Error test
with integer. The meaning of the return value is same as that of
the command parameter.
on
page
N9360A Multi UE Tester GSM Programming Manual
4-18.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs8210

Table of Contents