Replacement 8 UPPER UNIT (Reference only)
Accesses Position (All the numbers show the procedure number.)
8)
Note: When carrying out the work
described next procedure, route the
harness of the TRANSFER ASSY
through the groove of the UPPER UNIT.
1) Mate the two holes of the UPPER UNIT
with the bosses of the FEEDER ASSY and
attach it.
Chapter 3 Removal and Replacement Procedures (RRPs)
3 - 149
10)
11)
9)