Dell 2130cn Service Manual page 593

Hide thumbs Also See for 2130cn:
Table of Contents

Advertisement

Chapter 3 Removal and Replacement Procedures (RRPs)
Replacement 4 ROLL ASSY REGI (PL3.2.9)
1) After the inserting the left shaft of the
ROLL ASSY REGI into the hole of the
FEEDER ASSY NV AIO, insert the right
shaft of the ROLL ASSY REGI into the
hole. Attach the ROLL ASSY REGI
together with the ACTUATOR REGI OUT
and the ACTUATOR REGI ROLL.
Note: When carrying out the work this
procedure, move the ACTUATOR REGI
OUT to right until it stops.
2) Attach the BEARING R to the ROLL
ASSY REGI.
Note: When carrying out the work this
procedure, it is easier to push the ROLL
REGI METAL (PL3.2.10) to frontward.
3) Secure the BEARING R to the ROLL
ASSY REGI with the E-ring by using the
pliers.
3 - 142

Advertisement

Table of Contents
loading

Table of Contents