Canon imageRUNNER ADVANCE 8105 Series Service Manual page 128

Hide thumbs Also See for imageRUNNER ADVANCE 8105 Series:
Table of Contents

Advertisement

2
Technology > Image Formation System > Controls > Image Stabilization Control
Execution Timing
Execution items for image stabilization control differ according to the environment and condition of image formation parts. Following shows the control items at each sequence.
Illustration.*70 deg C or lower in the fixing temperature,**60 sec.70 deg C or lower in the fixing temperature,***Fixing temperature remaining high at power OFF/ON
Standard
Warm-up rotation
duration
Control
(second)
At
Normal
Approx.
startup*
startup**
Full Potential
8
×
Control
APC Correction
0.2
×
×
at Paper Interval
APC Control
at Warm-up
2
×
×
Rotation
APC Correction
2
×
×
at Last Rotation
Drum Idle
Rotation at First
60.0
×
in the Day
Charging Wire
30
×
×
Cleaning
2
Technology > Image Formation System > Controls > Image Stabilization Control
Timing
Initial
Paper
rotation
interval
power
Door
Jam
OFF/
open
recovery
ON***
(○ ) *2
×
×
×
×
×
×
×
×
*5
(○)*6
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
×
Last
Interruption
Arbitrary
rotation
Forcible
PASCAL
interruption
Low duty
Normal
(Full
at 2,000
ejection
correction)
sheets
(○)*3
(○)*1
×
×
×
×
×
×
×
×
×
(○)*7
×
×
×
×
×
×
×
(○)*8
(○)*8
×
×
Remarks
PASCAL
(Quick
correction)
*1 Operation Criteria
Last rotation after the first job right after startup first
time for the day takes 10 minutes or longer
Last rotation after processing 1,500 sheets or more
following the last potential control execution
Last rotation after the first job following 90 minutes or
more elapsed from the last potential control execution
*2 Operation Criteria
Every initial rotation for the job that start within 10
minutes after density judgment at normal startup
mode (60 seconds startup)
Initial rotation for the first job that starts after more
than 10 minutes have passed from density judgment
at normal startup mode (60 seconds startup)
*3 Operation Criteria
Forcible interruption when the accumulated value of
the paper interval VL correction value exceeds 10V
within 10 minutes after density judgment at normal
startup mode (60 seconds startup)
*5 At every 20-sheet interval
×
*6 Operation Criteria
Initial rotation after the first job following 60 minutes or
×
more elapsed from the last job completion
*7 Operation Criteria
Last rotation after the first job following 30 minutes or
×
more elapsed from the last job completion
×
*8 Operation Criteria
Last rotation after 1,500 sheets or more processed
following the last Charging Wire cleaning execution
×
Forcibly interruption at 2,000 sheets or more
processed following the last Charging Wire cleaning
execution
2-75
2-75

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents