Ezgo 1600xd Repair Manual page 364

4x4
Table of Contents

Advertisement

Connect the positive test lead to the pin No. 2 and the
negative test lead to the pin No. 3 of the cluster con-
nector and measure the VDC with the ignition switch in
the "ON" position.
INSTRUMENT PANEL WIRE CONNECTOR
WB
B
1
2
3
4
5
20
19
18
17
16
Connect the positive test lead to the pin No. 11 and
the negative test lead to the pin No. 6 of the display
unit connector and measure the VDC with the ignition
switch in the "ON" position.
DISPLAY UNIT WIRE CONNECTOR
1
2
3
7
8
9
10
12
-26
ELECTRIC SYSTEM - ELECTRICAL COMPONENTS
UUVWAB1A
6
7
8
9
10
15
14
13
12
11
UUVWAB2A
4
5
6
B
11
12
13
LG
Temp. (°C)
15°
30°
To display
Approx.
Approx.
unit input
3.2 V
2.5 V
(VDC)
To instru-
ment cluster
Approx.
Approx.
input
10 V
10 V
(VDC)
REMARK
• The temperature sensor is a dual sensor and it
has two purposes.
Coil
The coil with low resistance in the sensor is for
temp. gauge. Therefore the voltage value does
not change a lot as shown in the table above.
However, the other coil with high resistance in
the sensor is for supplying the signal to display
unit so that it can determine when the fan motor
or preheat relay should be activated. Therefore
a v o l t a g e s m e a s u r e m e n t i s r e c o m m e n d e d
for preheating and fan motor sensor testing
as shown in the table above. A resistance
measurement is recommended for temp. gauge
check as below table.
1. SENSOR FOR TEMP. GAUGE
Resistance
Temp. (°C)
60
Resistance
(125)
48.4
(Ω)
( ) : Reference value
60°
Remarks
Preheating
Approx.
or fan
1.4 V
operation
Approx.
Temp. gauge
operation
10 V
PT 3/8
UUVWAB5A
85
110
125
+ 2.2
24 ㄴ
(15.2)
± 5.8
- 1.9
SUUV-W00 Apr. 2011

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents