Switching On - R&S AFQ100A Operating Manual

I/q modulation generator
Hide thumbs Also See for AFQ100A:
Table of Contents

Advertisement

R&S AFQ100A

Switching On

Power connector
Fuse box
Power
switch
Note:
The power switch may remain on for any period of time. Switching off is required only if the
instrument ought to be isolated from the AC supply completely.
1401.3078.62
Connect the modulation generator to the AC supply by means of the
supplied power cable.
Press the main Power switch at the rear of the instrument to
position I.
After power-up the instrument is either ready for operation
(STANDBY) or in operating mode, depending on the position of the
ON/STANDBY switch on the instrument front (see below).
Press the ON/STANDBY key on the front panel.
The instrument is ready for operation. All modules inside the
instrument are supplied with power.
Lighting green the LED at the top left of the switch indicates that the
instrument is power supplied and ready for operation (ON).
1.17
Putting into Operation
E-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Afq100b

Table of Contents